ISI is currently providing special inspection and materials testing services for the EBMUD Orinda Water Treatment Plant Disinfection and Chemical Systems Safety Improvements project. This project includes the demolition and replacement of chemical feed systems, construction of a new two-story Ultraviolet Disinfection Facility, installation of two electrical buildings and other supporting facilities, pipeline installation and modification of the raw water spillway.

  • Connector.

    Duration

    2022 – Present

  • Connector.

    Construction Value

    $268 Million

  • Connector.

    Owner

    EBMUD

Share this Project

Leave a Comment

* Copy This Password *

* Type Or Paste Password Here *